Press Room
NEOCIVIL AT THE BRAVURA DAM

The General-Directorate for Agriculture and Rural Development (Direcção Geral de Agricultura e Desenvolvimento Rural, DGADR) awarded Neocivil the contract for the execution of the Energy Dissipation Works Downstream of the Bravura Dam, built in 1958 by the company Moniz da Maia & Vaz Guedes.

The total value of the works was 72.000 euros and the execution time of 2.5 months.

The contract consisted of the execution of a dissipation basin, including slope stabilisation and drainage with Reno type mattresses.

This work aimed to improve the structure intended for the use of the Bravura dam’s water for the irrigation of a perimeter of about 1800 acres of land in the counties of Lagos and Portimão.




Back